Gallery

TRIP 2022: Dominican Republic

Day one: our team at the construction site

Day two: participating in a wedding

Day three: baptizing this baby

Day four: church

Day five: kids playing ball at the beach

Mixing the last load of concrete to finish the floor.

Day six: the property owner covering up the roof as heavy rain was expected.

Day seven: starting the roof and interior finish

Final day of construction: painting, electrical, plumbing, and concrete floor.